These generators located after the stock ramps. The large one, supply power to the corridor of the storage of Carmel hospital and locations nearby during power interruption.
When it is operating, its diesel motor, produces a 100hz frequency noise.
It is tested at sunday from 6:00-6:30 at the morning.