I've thought about doing that as well... buying the high tech Stud Finder along with the laser leveler, and then setting up one shelf, and then setting
up one fixture, both as tests to see what it'll look like... then posting to Lighting Gallery. I think this will be my next plan.
After that, I'll be setting up just the brackets until every bracket is in place. (This will take a while since I'll be purchasing each shelf and bracket
when I have the money, certainly can't afford purchasing all of them at once.)
When all brackets are installed, that's when I'd work on purchasing the fixtures and ballasts... but again... I'm a bit frantic about that because of the
stupid bans. I may have to purchase the fixtures and ballasts FIRST before everything else.
I guess we shall see.
I know for a fact that I'll be purchasing bulbs next, possibly on my next upcoming paycheck later this week.